Fort Bragg, CA
Home MenuDocuments
- Permits/Applications/Brochures
- General Plan/Zoning
- Long Range Planning
- Housing
- CDBG Program
- City Projects
- NOPA
- WWTF Biosolids and PV Project - MND 10-31-2024
- NOPH- ISMND and NOPH WWTP
- Inclusionary Housing Incentives Hearing Notice 11-12-2024
- Inclusionary Housing In Lieu Fee Hearing Notice 11-12-2024
- NOFA_LaBoneAtory
- NOE for LCP Amendment
- NOE for Laboneatory
- NOE for Laboneatory signed
- Notice of Exemption
- 08282024 Agenda SP
- 08282024 Agenda
- NOE Signed
- Public Hearing Notice - 310 Walnut Espanol
- Public Hearing Notice - 310 Walnut English
- NOE_for_Laboneatory
- LTP 14-24 Lions Club Carnival
- NOE Signed
- NOFA CDP 1-24 UP 1-24, DR 1-24 620
- Site Map Example
- 04102024 Agenda
- 03272024 Agenda
- 03262024 agenda
- Final LTP 9-24
- Final LTP 8-23
- Final 06-24 LTP
- Notice of Cancellation
- Public Hearing Notice ILUDC 6-23
- Public Hearing Notice ILUDC 3-23
- 12132023 pc agenda
- NOFA 20231118
- Notice of Intent to Adopt MND 20231103
- MUP 3-23
- VAR 23-3
- LPT 27-2023 Magic Market Permit
- 1 Permit LTP 23-2023 Revised X Country Turkey Trot
- Quarterly Downtown Merchant Meeting
- ZON-1-23 Public Hearing Notice
- UP-1-23 Public Hearing Notice
- ADU - Public Hearing Notice 9-13-2023
- Press Release - CBD Parking Study Workshop
- Revised - RFP Mill Pond EIR
- NOFA CDP-2-22
- Final EIR: Part III
- Final EIR: Part II
- Final EIR: Part I
- Appendix H
- Appendix G
- Appendix F
- Appendix E
- Appendix D
- Appendix C
- Appendix B
- Appendix A
- 4.0: Mitigation Monitoring and Reporting Program
- 3.0: Revisions
- 2.0: Comments and Responses
- 1.0: Introduction
- 0.2: Executive Summary
- 0.1: Table of Contents
- 0.0: Cover
- 06052023 Grocery Outlet Notice of Hearing
- Sign Permit Application
- Draft EIR - Complete
- 05102023 Grocery Outlet Notice of Hearing
- GO Cover Page and Table of Contents
- GO - Appendix E
- 2.0 part 4
- 2.0 part 3
- 2.0 part 2
- 2.0 part 1
- 4/20/2023 Press Release - Grocery Outlet Planning Commission Meeting Update
- DRAFT EIR
- Final EIR: Revisions
- Utility Assistance Program Application - Spanish
- Utility Assistance Program Application - English
- Final EIR: Appendix D
- Final EIR: Appendix C
- Final EIR: Appendix B
- Final EIR: Appendix A
- Final EIR: Mitigation Monitoring and Reporting Program
- Final EIR: Revisions
- Final EIR: Comment on Draft EIR and Responses - Part 3
- Final EIR: Comment on Draft EIR and Responses - Part 2
- Final EIR: Comment on Draft EIR and Responses - Part 1
- Final EIR: Introduction
- Final EIR: Cover Page
- FLIER Shred Event 2023
- Pre-Application Worksheet
- Address Listing Request Form
- Planos y Deseno Gratis Para 2do Unidades
- City Facility Use Application
- Permiso de Tiempo Limitado - Eventos Especiales
- Tiny Homes Brochure
- Resources List
- 09152022-ISMND- Transfer Station -CoFB
- Grocery Outlet Public DEIR w Appendices_September 2022
- Fort Bragg Grocery Outlet IS
- Draft ND Cannabis Ordinance for recirculation
- ISMND_03.24.22_DOC
- Draft Initial Study for Cannabis Ordinances
- 02-28-2022 PH Notice - Grocery Outlet vacate permit
- Avalon Hotel Initial Study
- Grocery Outlet Initial Study
- Zoning Map
- Clean Complete Elements 1-7
Bainbridge Park Enhancement Project
Phase II - Full Park Enhancement Project
The Bainbridge Park Enhancement Project includes various new amenities as well as rehabilitation of existing features using the $2M State Park Program funding the City was awarded in 2023. In accordance with the grant scope, design amenities of the Park Enhancement Project include:
- The construction of a new multi-use pavilion
- Construction of two 50' x 80' fenced, artificial surface soccer pitch with lights
- New public art and landscaping throughout park
- Master lighting control system and new lights
- Poured ADA surfacing for the 11,000sf playground area
- Camera System for park
- Minor cosmetic and maintenance upgrades to existing bathroom facilities
- Incorporation of existing drainage into the park layout
At its regular meeting on September 11th, 2023 Fort Bragg City Council awarded the contract for design services to Melton Design Group.
On January 10, 2024, the City and Melton Design Group hosted a public meeting seeking input for the project design.
View the Presentation from the public meeting by clicking on the image below
Phase I
Playground Construction
The Wiggly Giggly Playground Equipment has been purchased and a contract awarded to Akeff Construction. The Playground area of the park is currently under construction. Sign up for progress updates on the City’s enotification page: http://www.city.fortbragg.com/about-us/enotification
20 Year Old Playground Being Replaced - Sneak Peak at the New Look Below
The current Equipment at Wiggly Giggly was installed in April 2004. The playground is almost 20 years old and it's replacement has arrived on the coast. We are so Excited to have the new playground built and in service for the children of our coastal community. Notifications, Press Releases, and Social Media posts will be created and distributed to keep you up-to-date on the progress.
Bainbridge Park Master Plan [2016]
The Bainbridge Park Master Plan was completed by City staff in 2016. The plan incorporated several iterations of public engagement and input prior to final acceptance by City Council. The full text of the plan is located here: Bainbridge Park Master Plan.