Fort Bragg, CA
Home MenuDocuments
- 2024 Pre-Application Worksheet.
- NOPA for MVU 24-01
- NOFA - DR 10-24 AAP Mural 130 N. Main St.
- 08142024 Agenda SP
- 08142024 Agenda
- NOPH_LaBoneAtory
- NOPH_-_Cafe_1
- Agenda
- LTP 23-24 FBPD National Night Out
- NOFA_CDP_7-24
- Public_Hearing_Notice_-_ADA_Sidewalks
- Public_Hearing_Notice_-_LABoneAtory
- LTP 19-24
- LTP 18-24
- 05229024 Agenda
- LTP 17-24
- LTP 16-24
- LTP 15-24
- NOE Signed
- NOE
- Address Listing Request 2024
- Sign Permit Application
- NOPA
- LTP 13-24
- LTP 2-24 Buy Back Center - 255 S. Harold
- NOFA CDP 3-23 - 105 S Main Street Gas Station remodel (Eel River Fuels) (1)
- LTP 32-23 Shred Event
- LTP 11-24 Project Sanctuary at CV Starr
- Public Hearing Notice for 04242024
- Public Hearing Notice 105 S. Main
- Signed NOE DIV 1-23
- Signed NOE Bears Pizza
- Final LTP 5-24
- Final LTP 4-24
- Final Public Hearing Notice 20240313
- NOAPH CDP 4-23
- NOAPH CDP 4-23
- NOPA CDP 4-23
- Final Public Hearing Notice 20240126
- FINAL Public Hearing Notice DIV 1-23
- DRAFT LTP 03-24 Crab Cake Cook-Off
- Event LTP 1-24 MCSF and Rotary 20240108
- NOPA for MVU 5-23
- Final NOPA for MVU4-23
- LTP 34-23 Lighted Truck Parade
- NOFA 20231120
- NOFA 20231121 signed
- Public Hearing Noice MUP 3-23
- VAR23-3 NOPA
- 1 LTP 28-2023 Tire Amnesty
- LTP 30-2023 Autism AI Bainbridge
- Permit LTP 23-0026 MCHF Marathon
- NOD
- Workshop Flyer Dec. 14
- Continued CalTrans Public Hearing Notice PH CDP 6-22 Caltrans ADA 12/14/2022
- CDP 4-21 NOFA
- Notice of FInal Action DR 16-22
- NOFA MVU 1-22 Signed
- 248 E Laurel Design Review
- 7-1-22 COASTAL DEVELOPMENT PERMIT
- Design Review Brochure- CLUDC (PDF)
- Coastal Development Permit Brochure- CLUDC (PDF)
- Waste Management Checklist (PDF)
- Variance Brochure (PDF)
- Use Permit Brochure- ILUDC (PDF)
- Use Permit Brochure- CLUDC (PDF)
- Subdivision Brochure (PDF)
- Sign Permit Brochure (PDF)
- Sign Permit Application 2019
- Sample Fees For Single Family Residences (PDF)
- Revisión del Diseño (PDF)
- Requerimientos para la Presentación de un Permiso de Construcción (PDF)
- Proceso de Revisión del Permiso de Construcción (PDF)
- Permisos de Uso y Uso Menor (PDF)
- Permisos de Desarrollo Costero (PDF)
- Letreros (PDF)
- Frequently Asked Questions for Business subject to Industrial Discharge Compliance
- Fences (PDF)
- Design Review Brochure- ILUDC (PDF)
- Construction Waste Minimization and Recycling Guide (PDF)
- Planning Permit Flowchart (PDF)
- Planning Application and Notice (PDF)
- Outdoor Sidewalk Vending Application
- New Development Pre-Application Checklist (PDF)
- Electric Vehicle Charging Checklist
- Building Permit Submittal Requirements (PDF)
- Building Permit Review Process Brochure (PDF)
- Building Permit for projects with over 120 ft of Ground Disturbance
- Building Permit for 0-120 sq ft of Ground Disturbance
- Building Permit Flowchart (PDF)
- Building Permit Application (PDF)
- ADDRESS LISTING REQUEST 2019
Bainbridge Park Enhancement Project
Phase II - Full Park Enhancement Project
The Bainbridge Park Enhancement Project includes various new amenities as well as rehabilitation of existing features using the $2M State Park Program funding the City was awarded in 2023. In accordance with the grant scope, design amenities of the Park Enhancement Project include:
- The construction of a new multi-use pavilion
- Construction of two 50' x 80' fenced, artificial surface soccer pitch with lights
- New public art and landscaping throughout park
- Master lighting control system and new lights
- Poured ADA surfacing for the 11,000sf playground area
- Camera System for park
- Minor cosmetic and maintenance upgrades to existing bathroom facilities
- Incorporation of existing drainage into the park layout
At its regular meeting on September 11th, 2023 Fort Bragg City Council awarded the contract for design services to Melton Design Group.
On January 10, 2024, the City and Melton Design Group hosted a public meeting seeking input for the project design.
View the Presentation from the public meeting by clicking on the image below
Phase I
Playground Construction
The Wiggly Giggly Playground Equipment has been purchased and a contract awarded to Akeff Construction. The Playground area of the park is currently under construction. Sign up for progress updates on the City’s enotification page: http://www.city.fortbragg.com/about-us/enotification
20 Year Old Playground Being Replaced - Sneak Peak at the New Look Below
The current Equipment at Wiggly Giggly was installed in April 2004. The playground is almost 20 years old and it's replacement has arrived on the coast. We are so Excited to have the new playground built and in service for the children of our coastal community. Notifications, Press Releases, and Social Media posts will be created and distributed to keep you up-to-date on the progress.
Bainbridge Park Master Plan [2016]
The Bainbridge Park Master Plan was completed by City staff in 2016. The plan incorporated several iterations of public engagement and input prior to final acceptance by City Council. The full text of the plan is located here: Bainbridge Park Master Plan.